On the Detail Library, we’re introducing a comprehensive set of fire and acoustic details specifically designed for material change of use projects, where existing buildings are being converted into dwelling-houses and flats.
Working on conversions and material alterations brings unique challenges, particularly when upgrading existing structures to meet current Building Regulations Part B (Fire Safety) and Part E (Resistance to the passage of sound). This new set provides practical solutions for the most common upgrade scenarios you’ll encounter.
Details included in this set:
- New Internal Timber Wall Partitions 30/60 Minute Fire Ratings
- New Internal Metal Wall Partitions 30/60 Minute Fire Ratings
- Existing Internal Timber Floor Upgrade 30/60 Minute Fire Ratings
- Existing Internal Timber Floor Suspended Ceiling Upgrade 30/60 Minute Fire Ratings
- Separating Wall Treatment 1 & 2
- Separating Floor Treatment 1 & 2
- Separating Floor Treatment 1 to High Window Head Detail
- Separating Floor Treatment 1 to Separating Wall
- Separating Floor Treatment 2 to Separating Wall
- Separating Stair Treatment
- Separating Floor Treatment 1 Service Penetration
We hope you find this latest set useful in your projects.






Latest Article
If you are interested in joining our community, head over to the Detail Library to learn more about our platform and get yourself signed up.









0 Comments